Engconsultproject Ltd as a partner in Egis Bulgaria executed a contract with the subject of Preparation of preliminary design for completion of Hemus Highway (stage 2) – sections 4 and 5.
The designed route has a length of 55,856 km and a design speed of 140 km/h and gauge A29.